|
||||
| Back to "Equipment and Processes" Search | Back to Main Search | |||
| Session 6: Process Diagnostics & Controls 4 | ||||
| Location: Room 201 (Washington State Convention Center) | ||||
| (Please check final room assignments on-site). | ||||
| Session Description: | ||||
| Session Chair: | Dr. Michael Gevelber Boston University, Brookline, MA | |||
| 10:50 AM | EAP1.1 | Diagnostic of the Arc Spraying Process through Cored Wires | ||
| 10:50 AM | EAP1.2 | Effect of Torch Hardware and Operating Parameters on Oxy-Acetylene Powder Flame Spray Heat Flux | ||
| 10:50 AM | EAP1.3 | High Speed Visualization and Plume Characterization of Hybrid Spray Process | ||
| 10:50 AM | EAP1.4 | Tailoring of Wire Feedstock and Processing Conditions in High Velocity Combustion Wire Spraying | ||