| 
 | ||||
| Back to "Applications and Case Studies" Search | Back to Main Search | |||
| Case Studies: Equipment and Processes | ||||
| Location: Virginia City I (Flamingo Las Vegas Hotel) | ||||
| (Please check final room assignments on-site). | ||||
| Session Description: | ||||
| Session Chair: | Mr. Rongliang Hao Shanghai Baosteel Equipment Maintenance Co., Ltd, Shanghai, PRC, Shanghai, China | |||
| 9:00 AM | External Ballistics of Powder Under Detonation Spraying | |||
| 9:20 AM | Electric Characteristics of Plasma Arc Produced by Bi-Anode Torch | |||
| 9:40 AM | MMCs Coatings with High SiC Volume Fraction Retention by Pulsed-Gas Dynamic Spraying | |||
| 10:00 AM | Break | |||